Protect the structure that protects the whole home. IGS helps homeowners plan roof replacement, storm damage repairs, asphalt shingles, and metal roofing with the same whole-home view we bring to solar and energy upgrades.
Roof Condition
Review age, leaks, decking, ventilation, and weather exposure before recommending a roof path.
Material Planning
Compare asphalt shingles and metal roof options with budget, durability, and home style in mind.
Energy Ready
Coordinate roof work with solar, attic ventilation, and future home energy improvements when needed.
A roof project should be planned before water damage, emergency repairs, or a rushed solar conversation force a decision. We look at the roof as part of the home energy system: weather protection, ventilation, roof life, and future work all matter.
Our team helps define the practical scope, then keeps the process clear from review through installation planning.

Assess
Confirm roof condition and visible risk before recommending replacement.
Plan
Choose materials, details, ventilation, and project timing.
Coordinate
Sequence roofing with solar, electrical, or other home upgrades.

If the roof is aging, leaking, storm damaged, or close to a solar project, it is better to review it before the next emergency. A planned roof project gives you more control over material choices, timing, and budget.

Roof Review
We look at visible roof condition, age, drainage, ventilation, and known leak history.
Scope Planning
We define whether repair, full replacement, or coordinated project planning is the right path.
Material Selection
You review practical asphalt and metal options for the home and budget.
Installation Planning
We schedule the work path and keep related home-energy work coordinated.
Every home has different constraints. We keep the recommendation focused on the project path that actually fits your house, budget, and timing.
When a smaller repair is enough, we keep the scope focused.
When roof life is near the end, we plan the full system.
When solar is part of the plan, roof timing is handled first.
Home projects are easier when the next step is clear. We review the existing condition, define the practical project path, coordinate related systems, and keep the work focused on the home.

1. Roof Review
We look at visible roof condition, age, drainage, ventilation, and known leak history.

2. Scope Planning
We define whether repair, full replacement, or coordinated project planning is the right path.

3. Material Selection
You review practical asphalt and metal options for the home and budget.

4. Installation Planning
We schedule the work path and keep related home-energy work coordinated.
If the roof is near the end of its useful life, replacement before solar is usually the cleaner path. It avoids removing new solar equipment later.
Yes. The right material depends on the house, budget, roof geometry, and how long you plan to stay in the home.
We can review visible damage and help define the next practical step. Insurance decisions still depend on the carrier and policy.
Roof condition, ventilation, insulation, and future solar all affect the best sequence of work.
We don’t spam or sell your contact information. Let us meet with you to learn how we can help you start saving energy and building energy independence for your home.