Upgrade to 200-amp service for EV chargers, heat pumps, and solar. Professional, insured inhouse electrical crew. Breaker panel replacement, service upgrades, and whole-home rewiring done right the first time.

Local insured electrical crew. No pressure.
Schedule My Electrical Assessment →Share a little about your home. We’ll prepare a practical next step for your service line — no obligation, no pressure.
Local insured electrical crew. No pressure.
🔒 Your information is secure. We never share or sell your data.
Over 1,000 residential installations across Upstate New York.
Most older NY homes run 100-amp or 150-amp electrical service — not enough for today's EV chargers, heat pumps, and solar arrays. A 200-amp service upgrade gives your home the capacity it needs.
Aging breaker panels — particularly Zinsco, Federal Pacific, and older fuse panels — can be safety hazards. We replace main panels and breaker boxes with modern, code-compliant equipment.
Electrical panel work and service upgrades are permit-and-inspection work in New York. IGS is a licensed NY Home Improvement Contractor (HIC WC-32128-H19). Our inhouse electrical crew handles permits, utility coordination, and the full installation — no subcontractors.
A 200-amp service upgrade gives your home the amperage needed to support modern loads — EV Level 2 chargers (40–50 amps), heat pump systems, and solar grid-tie. Often required before any major upgrade.
NEC 2023 load calculation requirementsWe replace outdated main panels and breaker boxes with modern, code-compliant equipment from leading manufacturers. All work is permitted and inspected.
NY State electrical codeA clear, no-pressure process from first call to final activation.
We assess your current electrical service, panel condition, and what you're planning — EV charger, heat pump, solar, or general capacity upgrade. We'll tell you exactly what's needed.
We provide a detailed quote covering labor, materials, and any utility coordination. We handle permit applications.
Our insured inhouse electrical crew handles the complete service upgrade — meter base, main panel, breaker replacement, and any subpanel work needed.
All electrical work is inspected by the local authority. We walk you through the new panel and any GFCI/AFCI upgrades made during the install.
No pressure. We'll tell you honestly what your home actually needs — and what can wait.
Reviews from real IGS customers across Upstate NY.
“IGS upgraded our electrical service before we got our heat pump. The crew handled permits, the utility coordination, and finished in one day. The new 200-amp panel handles everything with room to spare.”
“Our old Zinsco panel was a liability. IGS replaced it cleanly and handled the inspection. The whole job was done in a day and a half. I feel better knowing the electrical is right.”
“The solar company said we needed a panel upgrade first. IGS did the service upgrade and the solar in sequence — one team, no coordination headaches. The amperage was exactly what we needed.”
Do I need a 200-amp service upgrade?
If your home runs on 100-amp or 150-amp service and you're planning to add an EV charger, heat pump, or solar system — yes, in most cases. We'll assess your existing service and load in the consultation.
What's the difference between a service upgrade and a panel replacement?
A service upgrade changes the amperage coming into your home (from the utility meter through to the main breaker). A panel replacement swaps out the breaker box itself. Sometimes you need both — we'll identify exactly what's required.
How long does a 200-amp service upgrade take?
Most 200-amp service upgrades take 1–2 days on site. The utility may need to disconnect and reconnect power at the meter — we coordinate that scheduling.
Is a permit required for electrical panel work?
Yes — all electrical panel work and service upgrades in New York require a permit and inspection. IGS handles all permit applications and schedules the inspection.
Can I get the electrical upgrade done at the same time as my solar or heat pump install?
Yes — IGS installs electrical, solar, and heat pumps. We sequence the electrical upgrade first, then the service install. One team, one proposal.
Get a free electrical assessment from a licensed NY Home Improvement Contractor — main panel replacement, breaker upgrades, and 200-amp service upgrades done right.
Schedule My Electrical Assessment